Kilchberg

Led by AGITEC AG, the Swiss demonstrator is located at Wiesenweg 2 in Urdorf, Switzerland – a region defined by a continental climate with cold winters and moderate summers.
The project centers on an existing residential structure featuring cavity masonry walls, focusing specifically on three exterior walls with an 8–9 cm masonry interlayer cavity. Within this building, we will test several individual and combined retrofit solutions recommended by our Digital Tool Assistant, prioritizing thermal performance upgrades while preserving the original facade aesthetics.

Implementation of Innovative Solutions in a Real Building
Led by AGITEC AG, the Swiss demonstrator is located at Wiesenweg 2 in Urdorf, Switzerland – a region defined by a continental climate with cold winters and moderate summers.
The project centers on an existing residential structure featuring cavity masonry walls, focusing specifically on three exterior walls with an 8–9 cm masonry interlayer cavity. Within this building, we will test several individual and combined retrofit solutions recommended by our Digital Tool Assistant, prioritizing thermal performance upgrades while preserving the original facade aesthetics.
The Swiss demonstrator represents one of the three SNUG pilot sites (Switzerland, Spain, Norway) and focuses on the real-scale implementation, monitoring, and evaluation of advanced insulation solutions in an existing residential building.
The building is characterized by a double-wall masonry system with an interlayer cavity of approximately 8–9 cm, present on three out of four façades. In addition, one wall of the building does not contain a cavity, allowing the integration of a complementary solid wall insulation solution. This configuration enables the comparison of different retrofit strategies within the same building under identical boundary conditions.
The demonstrator combines:
- real building retrofit conditions
- full-scale monitoring (thermal + indoor air quality)
- development and validation of circular aerogel-based materials
- comparison between cavity insulation and solid wall insulation approaches
The total estimated volume for cavity insulation is approximately 7–9 m³.
The main objectives of the Swiss demo are:
- Improve thermal performance of the building envelope through retrofit insulation;
- Validate the effectiveness of aerogel-based insulation solutions in real conditions;
- Monitor energy performance and indoor environmental quality before and after intervention;
- Demonstrate circular material use through recycling of aerogel-based production waste;
- Generate comparable monitoring data aligned with the other SNUG demonstrators;
- Compare cavity insulation and solid wall insulation solutions within the same building.
Preliminary Works and Characterization
AGITEC AG initiated the Swiss demonstrator activities with a detailed building characterization. The selected structure features a double-wall masonry system with a cavity depth suitable for a blow-in insulation application. Using thermal imaging and U-value measurements prior to the retrofit, baseline heat transfer behavior was established. Calculated U-values before insulation ranged between 1.0 and 1.08 W/m²K, providing a thermal reference point for post-intervention comparisons.
In addition, a second pre-installation U-value measurement campaign has been carried out by the University of Stuttgart on the solid wall intended for the recycled board (ReTherm) application. The purpose of this measurement is to establish a dedicated baseline for the solid wall and enable accurate before/after comparison. The results are currently pending.
These values define the baseline for post-retrofit comparison
Initial Insulation Concept and Deviation
The initial concept for the Swiss demonstrator, developed during the SNUG design phase, was based on the use of blow-in insulation produced from recycled Pureflex and Agitherm waste. The objective was to combine circular material use with high thermal performance in a real retrofit application.
However, real-scale blow-in trials conducted in the building revealed critical limitations. The material exhibited very high dust generation, raising health and safety concerns for both occupants and installers. In addition, its behavior during injection was unstable, with insufficient bonding and lack of structural integrity within the cavity. These issues made the solution unsuitable for application in an occupied residential building.
As a result, the blow-in scrap solution was discontinued for Demo 1.
Updated Insulation
Following these findings, the insulation strategy was revised to ensure safe and reliable implementation under real conditions.
For the cavity walls, the solution was replaced with an industrial product (INSUTE), selected due to its stable installation behavior, reduced dust formation, and suitability for use in occupied buildings.
In parallel, an additional intervention was introduced for the solid wall (without cavity) of the building. This wall will be insulated using a newly developed recycled board, ReTherm. The board is produced entirely from circular materials, consisting of 100% recycled Agitherm flakes, recovered aerogel fine powder from the recycling process, and water, without the use of additional binders.
The ReTherm board has a thickness of 10 mm, a thermal conductivity of λ ≤ 0.020 W/m·K, and a density of approximately 160 kg/m³. Its application allows for a direct comparison between a conventional cavity insulation solution and a fully circular board-based insulation system within the same building.
Circular Innovation: Recycled Aerogel Board
The shift away from blow-in insulation does not weaken the circular concept of the demonstrator—on the contrary, it strengthens it through a more controlled and scalable approach.
The recycled board concept is based on the reuse of production waste from Pureflex and Agitherm materials. These waste streams are processed into flakes and combined with recovered aerogel fine powder, which is generated during the shredding and separation stages. The material is then formed into boards through a low-energy pressing process, where residual adhesive properties and water-assisted activation enable bonding without additional binders.
The ReTherm board represents a fully circular insulation material, utilizing 100% production of waste streams and recovered aerogel fractions. The targeted performance includes a thermal conductivity of approximately 0.020 W/m·K, improved structural integrity through optimized flake size distribution, and an energy-efficient manufacturing process.
Within the demonstrator, the board is installed on a solid wall of the same building, using the same monitoring setup as the cavity insulation. This allows for a direct and controlled comparison of different insulation strategies under identical boundary conditions.
Overall, this approach reinforces the circularity narrative of the SNUG project, following a clear pathway: waste → recovery → re-engineering → re-application.
Installation Strategy
The cavity insulation (INSUTE) will be applied through localized access points, allowing the material to be injected and fully fill the interlayer space of the masonry walls.
In parallel, the ReTherm board will be installed on the accessible surface of the solid wall using standard mounting procedures for thin insulation panels.
Monitoring Setup
A comprehensive monitoring system has been installed in collaboration with the University of Stuttgart (USTUTT) to evaluate both thermal performance and indoor environmental quality.
The system includes heat flux sensors, surface and air temperature sensors, humidity sensors, and indoor air quality monitoring devices (VOC, CO₂, and particle measurements).
Additional technical configuration includes two heat flux sensors mounted on prepared wall surfaces, four surface temperature sensors positioned across different wall layers, indoor and outdoor climate sensors, CO₂ monitoring via SwitchBot devices, and particle measurements using Alphasense and TSI equipment.
The monitoring system is designed to cover both the cavity-insulated walls and the solid wall where the ReTherm board will be applied, ensuring consistent and comparable data collection.
Monitoring Concept
The monitoring strategy is based on continuous measurements before and after the retrofit intervention. Due to occupant constraints, no reference room is available; however, a reliable baseline has been established through an extended pre-monitoring phase.
In addition, a second pre-installation U-value measurement campaign has been carried out by the University of Stuttgart on the solid wall intended for the ReTherm application. This provides a dedicated baseline for evaluating the performance of the recycled board, although the results are currently pending.
All data is stored and accessed through a centralized system (MPA cloud), enabling consistent analysis and integration with other SNUG demonstrators.
The monitoring focuses on heat transfer (U-value evolution), thermal comfort, indoor air quality, and comparative performance of different insulation strategies.
The Swiss demonstrator has successfully completed the building characterization phase and established a reliable baseline for thermal performance, with pre-insulation U-values ranging between approximately 1.0 and 1.08 W/m²K.
A second baseline measurement has also been conducted for the solid wall where the ReTherm board will be installed, with results currently pending.
The full monitoring system is installed and operational, providing continuous data acquisition. At the same time, real-scale testing has enabled the identification of critical limitations of the initial blow-in waste solution, leading to a strategic redesign of the demonstrator.
The project has now transitioned to a dual approach combining cavity insulation (INSUTE) with a newly developed recycled aerogel board (ReTherm). In parallel, AGITEC has advanced the development of its recycling process, including aerogel powder recovery and flake-based material reuse.
Overall, the demonstrator now integrates circularity as a core element and establishes a dual system that enables direct comparison between conventional and fully circular insulation solutions.
The next phase includes the installation of the INSUTE cavity insulation and the ReTherm recycled aerogel boards on the solid wall, followed by the start of the post-intervention monitoring phase.
Once the second U-value measurement results for the solid wall are available, they will be integrated into the analysis.
The project will then focus on comparing the performance of cavity insulation versus board-based solutions, as well as pre- and post-intervention thermal behavior.
Further work will include optimization of the recycled board formulation, particularly in terms of flake size distribution and aerogel powder integration, as well as scaling of the recycling process through the use of external waste streams and industrial partnerships.